critical path造句
1、What about dependencies and critical path analysis?
依賴和關鍵路徑分析如何去做?
2、Critical path is useful in regression testing and other severely time-constrained testing.
關鍵路徑在回歸測試和其它有嚴格時間控制的測試中十分有用。
3、161 on our most projects critical path method(cpm) is used for scheduling.
在我們的大多數(shù)工程項目中都采用“統(tǒng)籌法”(即關鍵路線方法,簡稱cpm)安排計劃。
4、DETERMINING OF CRITICAL PATH IN PERT NETWORK PROGRAM WITH FUZZY PROBABILITY
用模糊概率確定PERT網絡計劃的關鍵路線
5、This method of analysis is commonly known as the Critical Path method.
該分析方法通常被稱為關鍵路線法(Critical Path Method (CPM))。
6、161 On our most projects Critical Path Method (CPM) is used for scheduling.
下個月我們將召開設計數(shù)據(jù)收集(初步設計、最終設計)會議。
7、Hardware architecture and critical path analysis are also introduced.
給出了硬件結構圖及關鍵路徑分析。
8、S method, which was created by Kato Shokichi, the event on the critical path should be done first.
通常流行的日本加藤昭吉的K·S法,主張關鍵工序先進行。
9、Show the critical path for your project to quickly find problem tasks.
顯示項目的關鍵路徑:以快速查找有問題的任務。
critical path翻譯
【計】 關鍵路徑【經】 關鍵路線 詳情猜你喜歡
- with child造句
- tracksuit造句
- polymeric造句
- public eye造句
- board of directors造句
- regimen造句
- harrison造句
- perry造句
- dor造句
- valorous造句
- brush on造句
- gas well造句
- downgrade造句
- ferry造句
- ante造句
- hindi造句
- free end造句
- footloose造句
- unrepaired造句
- agglomerated造句
- metamorphism造句
- job shop造句
- cheerily造句
- beheaded造句
- peanuts造句
- uncannily造句
- doorknob造句
- nagasaki造句
- ho造句
- drop down造句
- forearm造句
- scantily造句
- make full use of造句
- ought to造句
- minder造句
- high-water mark造句
- Asian造句
- sound effects造句
- gordian knot造句
